‘Quick fix’ fault limiter solution for electricity network faults being trialled

Posted on 27 Apr 2022 by The Manufacturer

A new device which could play a crucial role in the future of the electricity network is being trialled by Western Power Distribution, the electricity network operator for the Midlands, the South West and South Wales.

The device – called EDGE-FCLi – has been installed on the University of Warwick campus in a trial believed to be the first of its kind in the UK. The power electronic fault current limiter solution could play a vital part in the future of the electricity network as more and more people put energy back into…

This content is for subscribers only. Subscribe now for free to read the full article.