EXHEAT integrates PLM and Microsoft AX

Posted on 6 Feb 2012 by Tim Brown
In any manufacturing business, bill of material maintenance is a chore.  But in a project-centric, engineered-to-order manufacturing business, it’s a downright dangerous chore. Make a mistake, in short, and the consequences can be painful. For if the ‘as built’ or ‘as manufactured’ bill of material doesn’t match the ‘as designed’ bill of material, then product…

This content is for subscribers only. Subscribe now for free to read the full article.